The scope of this contract is to supply of substation all required 36KV, 3150A, 40KA metal-clad, air insulated withdrawable switchgear.
The contract enduser is Pars Oil & Gas company and the project consultant is Ghods Niroo engineering company. The contract shall be delivered in a six month period and supplied in the first quarter of the year 2014.
This substation role is to feed units/plants within south pars gas field phases 22, 23 & 24 and for this reason, the supplied feeders will be installed ina very critical position within the system.
South pars gas field development phases 22, 23 & 24 are located in southern part of Iran beside the persian gulf in Bushehr province.
This project is the first project in which 36KV air insulated, metal-clad withdrawable switchgear with 3150A rated current and 40KA short circuit level installed in Iran and is very unique from this point of view.